See if we’re a fit

Casino Operations

Casino UX/UI design.
Product testing.

For casino operators and product teams preparing a launch or improving a live platform. HYPR connects journey review, responsive interface design and scoped product testing with your development team through a retained partnership.

See if we’re a fitFind your starting point

Three starting points / One retained scope

Review. Design.
Release support.

Use the review to set priorities, design to define the experience, and testing to check the implementation. Each can form part of the retained scope around your roadmap.

01Journey review

Find where the journey breaks down.

Review navigation, registration, game discovery or another agreed flow. Record the observations, environment and limits.

  • Journey and interface observations
  • Prioritised, annotated findings
  • An agreed action list

02UX/UI design

Design the screens and their states.

Develop the agreed site skin, journeys and interface states for desktop and mobile, with a handoff your developers can use.

  • Responsive screens and states
  • Components and interactive prototypes
  • Developer handoff and design review

03Product testing

Check changes before release.

Run agreed scenarios, record expected and observed behaviour, and retest changes with the delivery team.

  • Test scope and environments
  • Reproducible issues and ownership
  • Retest and acceptance-support records
When this helps

A launch needs a consistent site skin. A live journey needs clearer navigation or recovery states. Your developers need design decisions and review findings they can act on.

Product in view / Wageroo

One platform.
Across screens.

Home on desktop and mobile, captured on wageroo.co with a demo account, sample chat and sample wins. These live screens show the product as captured on 2 Nov 2026. HYPR contributed to the interface design, site-skin direction, written specifications and testing. The platform team built it.

Explore the full platform case
18+. Screenshots are shown as examples of HYPR’s work. They are not an offer or invitation to play.

Wageroo / Pre-launch delivery evidence

From the request.
To the record.

The request, the recorded retest status and the later live capture. Each example keeps the source dates and status differences visible.

HYPR contributed to the interface design, site-skin direction and written specifications, logged the issues and ran testing and final QA. The platform team built the changes.

01 / Pre-launch record

Move Home to the top of the left nav

Before / Requester's screenshot, 24 Sep 2026

After / Live site, signed out, 2 Nov 2026

Request, status and retest recordThe six source fields and review-sheet reference.
  1. 1 Request (quoted):

    "Move home button in the left nav to the top (see screenshot for how its appearing currently)". Why it matters (quoted): "Align to standard/common site nav, if left in current state it gives the illusion that the nav bar is broken".

  2. 2 Journey and environment:

    site navigation, left sidebar, desktop, live site wageroo.co. No staging environment is named in the records.

  3. 3 HYPR's contribution:

    HYPR raised the change in its Required Changes sheet with a screenshot taken on 24 September 2026. Who built it isn't recorded.

  4. 4 Change and status:

    Home is now the first item in the left nav. The final QA run marks it Complete. The Required Changes row still reads To review.

  5. 5 Retest:

    final QA run row 26, Complete. The sheet dates from 13 to 14 October 2026; no tester or row date is recorded. Seen on the live site on 2 November 2026.

  6. 6 Screens:

    before, the requester's screenshot (24 Sep 2026); after, wageroo.co signed out on 2 Nov 2026 at 1440 px wide, cropped to the sidebar.

Source: Wageroo Site: Required Changes (Sept 2026), Required Changes tab, row 8 (Must have, Home layout, marked NEW). Final Run - Wageroo Testing, Main List, row 26.

A pre-launch request from HYPR's review of Wageroo: Home moved to the top of the left nav, shown before and after.
Rewards and sign-up delivery recordsThe remaining two examples, with before and after views, source dates and retest status.
02 / Pre-launch record

Swap the rewards gift box for a money bag

Before / Requester's screenshot, 24 Sep 2026

After / Live header, demo account, 2 Nov 2026

Request, status and retest recordThe six source fields and review-sheet reference.
  1. 1 Request (quoted):

    "Please change this rewards claim icon in the top navbar to a moneybag/sack icon or something similar. (see screenshot)". Why it matters (quoted): "Giftbox is used among some other providers, moneybag will align more with the brand and look more custom".

  2. 2 Journey and environment:

    the rewards entry point in the top header, signed in, desktop, live site wageroo.co.

  3. 3 HYPR's contribution:

    HYPR raised the change with a screenshot taken on 24 September 2026; the red circle was drawn by the requester. Who built it isn't recorded.

  4. 4 Change and status:

    the header's rewards button now shows a money bag. The final QA run marks it Complete. The Required Changes row still reads In progress.

  5. 5 Retest:

    final QA run row 28, Complete. The sheet dates from 13 to 14 October 2026; no tester or row date is recorded. Seen on the live site on 2 November 2026.

  6. 6 Screens:

    before, the requester's screenshot (24 Sep 2026); after, the live header on 2 Nov 2026 at 1440 px wide, signed in as a demo account with sample data, cropped to the icons so no balance shows.

Source: Required Changes tab, row 11 (Must have, Home layout, marked NEW). Final Run - Wageroo Testing, Main List, row 28.

A pre-launch request from HYPR's review of Wageroo: the rewards button's gift box swapped for a money bag.
03 / Pre-launch record

Check and finish the logged-out sign-up journey

Before / No screenshot

State recorded in the sheet on 21 September 2026:

"Logged-out flow not yet reviewed; no social login seen."

After / Live site, signed out, 2 Nov 2026

Request, status and retest recordThe six source fields and review-sheet reference.
  1. 1 Request (quoted):

    "Check and finish the logged-out journey: hero with Register CTA, single-step sign-up (username, email, password, optional referral code, terms + 18+ tick) and one-click sign-up with Kick, Google and Telegram." Why it matters (quoted): "Every creator link lands here first. Kick login matches where streamer traffic comes from."

  2. 2 Journey and environment:

    logged-out home and the Register panel, desktop, live site wageroo.co.

  3. 3 HYPR's contribution:

    HYPR specified the journey in its Required Changes sheet on 21 September 2026. Who built it isn't recorded.

  4. 4 Change and status:

    the Register panel has the requested fields and the Kick, Google and Telegram options, plus a Wallet option the request didn't ask for. The home page has a Register button in the hero. The final QA run marks it Complete. The Required Changes row still reads To review.

  5. 5 Retest:

    final QA run row 33, Complete. The sheet dates from 13 to 14 October 2026; no tester or row date is recorded. Seen on the live site on 2 November 2026.

  6. 6 Screens:

    no before screenshot exists. The state recorded in the sheet on 21 September 2026 stands in: "Logged-out flow not yet reviewed; no social login seen." After, the Register panel on 2 Nov 2026, signed out, cropped to the form. Nothing was submitted.

Source: Required Changes tab, row 26 (Must have, Account), including its "Current state (21/09/2026)" column. Final Run - Wageroo Testing, Main List, row 33.

A pre-launch requirement from HYPR's review of Wageroo: a one-step sign-up with Kick, Google and Telegram, as it stands on the live site.

Separate delivery record / Cooked

Testing within the launch plan.

The HYPR 2026 deck records 200+ hours of platform testing and feedback for Cooked. That is a delivery record, not a claim of commercial uplift or certification.

Read the Cooked delivery context
Cooked and RebelBet product viewsLive Cooked captures and approved RebelBet concept designs, with separate project context.

Selected product work

Different briefs.
Clear context.

Cooked

The Cooked lobby on desktop with the Cross the Road feature card and the Originals row

The lobby leads with three campaign cards, then one bar for categories and search, then Cooked's own Originals ahead of third-party games.

Live capture, 2 Nov 2026cooked.com

Current cooked.com captures sit alongside the historical launch and testing record. The case keeps those two periods separate.

Explore the Cooked case18+. Screenshots are shown as examples of HYPR’s work. They are not an offer or invitation to play.

RebelBet

RebelBet lobby concept on desktop: sidebar, three campaign cards, live wins, category tabs and Continue playing

One product view: the desktop lobby on a near-black surround, Rebel Bet logo top left, the 500× Club card first in the carousel, Continue playing below.

Concept design, not yet builtRebelBet / Concept designs by HYPR

Concept designs by HYPR. Approved Figma design states for the lobby, collection and search, not a working product.

Explore the RebelBet case18+. Screenshots are shown as examples of HYPR’s work. They are not an offer or invitation to play.

How we work / Retained partnership

A partner around
your roadmap.

Start with the journeys, environments and releases that matter. We agree the design and testing responsibilities, work through a prioritised backlog and review the next cycle with your team.

  • A defined scope and clear owners
  • A delivery cadence and shared priorities
  • Regular review of the work and what comes next

Talent, media, production and specialist delivery costs are scoped separately where required.

Explore the wider HYPR team
Outputs, journeys and responsibilitiesWhat the team receives, the journeys we can scope and the division of responsibilities.

What the team receives

Useful outputs.
Clear next steps.

Agree the journeys, devices and states first. The outputs follow the scope, with a record of decisions and outstanding issues.

Journeys and interfaces

  • Journey maps, flows and navigation
  • Responsive screens and components
  • Loading, empty, error and recovery states
  • Content hierarchy and accessibility review

Handoff and review

  • Interactive prototypes where useful
  • Component and behaviour specifications
  • Design decisions and open questions
  • Implementation-review feedback

Testing and retesting

  • Agreed scenarios, devices and environments
  • Expected versus observed behaviour
  • Reproduction steps, evidence and owners
  • Fix version and retest outcome
Journeys we can scope

Registration and login · Account navigation · Game discovery · Promotions and terms · Deposits and withdrawals · Support · Player controls

Coverage is agreed per brief. This list does not imply every flow was delivered on every project.

Working with your team

Clear ownership.
A practical handoff.

HYPR’s agreed scope

Journey and interface design, scoped scenario reviews, annotated findings, implementation review and retest records.

Your delivery team

Platform access, development, integrations, operational decisions and specialist security or certification work. Final implementation and release acceptance sit with the agreed owners.

Before we start

Casino design
and testing FAQs.

Do you build the casino platform?

HYPR can design interfaces, map journeys, prepare handoff materials and support agreed testing. Platform engineering, integrations, security and certification are separate responsibilities, agreed with the delivery team.

Can you work with our existing casino platform?

Yes. We first establish which journeys, layouts and components your team or platform provider can change. Existing design systems, known issues and permitted test scenarios define the starting scope.

What should be in the first brief?

Start with the product stage and the journey or problem you want to address. Existing screens, a backlog and intended timing are useful if available. We can define the detailed scope together.

How are fees and delivery timing agreed?

We scope a retained partnership around the journeys, devices, design outputs and review cadence your team needs. Dependencies, development ownership and access are agreed before committing to delivery timing.

What does product testing cover?

The agreed user journeys, interface states, devices and test environment. Findings record expected and observed behaviour, reproduction steps and retest status. Security testing, game certification and platform engineering require their own agreed specialist scope.

Useful before the next brief

Start with the business

What needs to work
better next?

Tell us whether you are launching, redesigning or improving an existing journey. A short description is enough to start; we’ll agree the scope and responsibilities together.

See if we’re a fit